Clearing the obstacles
This project constructed 22 miles of main line adjacent to the existing main line that allows for two way train traffic on this critical piece of infrastructure. It required 1,100,000 CY of excavation, 7 bridges, 14 drainage structures and 22 miles of asphalt paving.