Clearing the obstacles
The project included all of the earthwork for construction of the new terminal and airfield drainage. It required over excavation under all footings, grade beams and basements. Our scope included all of the structural concrete backfill.
The airfield work included excavating and backfilling the de-icing tank, and constructing and regrading the existing drainage ditch along the runway.