Bob Bergkamp Const. Co. Inc.

Clearing the obstacles

All

02

Enable Midstream Wildhorse Gas Plant

The 90 acre site required over 250,000 CY of excavation. The project included 35 acres of fabric, 41,000 tons of base rock and 15,000 tons of rip rap.

Ready to make big moves?

Connect with us today