Clearing the obstacles
Bergkamp Construction was a subcontractor on this design build project. It included 22 90,000 gallon storage tanks, 13,000’ of new rail and 8 rail car loading stations. Our scope of work included grading the 50 acre site, installing 68,000 SY of geotextile fabric and 32,000 tons of subballast. The project won the Merit Award for Industrial Category from the Design Build Institute of America.