Koch – Wichita Campus

The Koch-Wichita Campus included realignment of more than a mile of a Wichita City street, mass excavation for a tunnel and 70,000 SF basement. The project involved stripping 91,000 CY of topsoil, 555,300 CY of excavation, and replacing 80,000 CY of topsoil. The 7 acre pond required 10,000 CY of clay liner.